KEEP PERFECT BAGSCUSTOM BAG PROGRAMMES BY QUANZHOU JUNYUAN BAGS Get a quote

How Do Sports Bag Programmes Work: Annual Kit Cycles and Reorders

A kit programme is a calendar, not an order. The club that plans the year — one approval, one production slot, one reorder date worked backwards from the first fixture — gets the same colour every season and never pays for an emergency shipment.

Wall planner showing a kit cycle with approval, production and reorder dates marked
A programme is four dates. The club controls the first; the rest is arithmetic.
Quick answer

A programme runs on four dates: the approval date, the production start, the delivery and the reorder. The club controls the first one. Everything after it is arithmetic, and the arithmetic is the only thing that reliably gets kit onto a bus before the first fixture.

What Is an Annual Kit Cycle?

An annual kit cycle is one design, approved once, produced once or twice a year, and reordered against the same approval. It is the opposite of the way most clubs start out, which is one order placed when the old bags fall apart. The difference is not diligence — it is that a cycle turns a colour into a record instead of a memory.

The cycle has four artefacts at its centre: the reference, the approved coupon set, the dye-lot record and the shade band. With those four in place the second year is a comparison. Without them the second year is a re-development, and a re-development is where the colour drifts, the delivery slips and the club starts looking at other options.

The six stages of a kit cycle. Four artefacts carry it from one year to the next.
Cycle stageWhat happensOutput artefactWho holds it
SpecificationSilhouette, compartments and colour are fixedTech pack, revision numberedClub
ApprovalCoupon set approved under one lightSigned coupon set and shade bandClub
First productionBulk runs from written approvalDye-lot record and inspection reportProduction team
In-seasonThe float is drawn downAttrition rateClub
ReorderCompared against the artefactsA repeat at the same colourClub
Next cycleRevision, if any, is numberedUpdated tech packClub

Why Does the Calendar Decide Everything Else?

Because a bag delivered after the first fixture has failed, whatever else is right about it. Clubs understand this intellectually and then plan forwards anyway: they decide in June that they need kit, and they expect it in August. Production does not work that way. Sampling is 6-10 working days from a signed-off tech pack and bulk is 35-50 days from written sample approval, and neither starts until the club has finished deciding.

The second calendar pressure is shared. Every northern-hemisphere summer sport wants the same spring production window, so the constraint is not only the production calendar but the dye-house and trim schedule behind it. A club that books in the spring gets the slot it wants; a club that books in June gets whatever is left, and pays for the privilege.

How Is the Reorder Date Calculated?

Backwards, in three steps. First, the date the kit has to be on the bus. Second, minus the bulk window of 35-50 days, minus the sampling window of 6-10 working days, minus the club's own approval time. Third, minus the shutdown periods that fall inside the window. What is left is the date the enquiry has to be raised.

The step clubs skip is the third one. A production calendar contains public holidays and plant shutdowns that are known in advance and published in advance, and they fall inside the window more often than not. A club that ignores them discovers in August that its 35-50 days became 70 because a national holiday fell in the middle of it.

Working backwards from the fixture. The shutdown step is the one clubs skip.
StepWhat is subtractedWindowNotes
Fixture dateNothing — this is the anchorFixedThe first match, not the first friendly
Bulk productionSubtracted from the fixture date35-50 daysFrom written sample approval
SamplingSubtracted from the bulk start6-10 working days12-15 working days for a complex build
Club approvalSubtracted from the sampling startClub decisionUsually the longest and least planned step
ShutdownsAdded back inside the windowPublished in advancePublic holidays and plant shutdowns
ResultThe enquiry dateArithmeticThe only date the club fully controls

What Is the Difference Between a Reorder and a New Order?

A reorder is a comparison against artefacts. A new order is a development. They are quoted differently, they are scheduled differently and they carry completely different colour risk. A club that understands the difference will do the work once and then reorder for years.

Practically, the reorder costs less in three ways: no pattern development, no fresh colour matching, and a lower quantity threshold — 300 pcs is open to discussion on a repeat where the standard figure is MOQ 500 pcs. It is also faster, because the sampling stage is a confirmation rather than a development.

How Does Attrition Drive the Order Quantity?

Bags disappear. They are lost on away trips, they are kept by players who leave, they are damaged, and they are simply worn out. A club that orders to the squad list will run short somewhere between October and February, and the shortfall will arrive at exactly the moment when there is no time to fix it.

  • Order the match-day squad, not the registered squad.
  • Add staff and coaches as a separate silhouette in the same colourway.
  • Add a float of plain units, ordered with the main lot and held back.
  • Track what the float is drawn down by, and use that to size the next order.
  • Set the reorder date at the point the float would run out, minus the production window.

What Happens When the Committee Changes?

Club committees turn over every year or two, and the kit programme usually lives with one person. When that person leaves, the next order starts from nothing and the colour has to be re-approved from a photograph of last season's bag. It is the most common cause of a shade change between year one and year two, and it is entirely administrative.

The fix is a one-page programme record held by the club: the reference and its library, the substrate list, the coupon set, the dye-lot numbers, the shade band, the tech pack revision number and the reorder date. One page, updated once a year, and a new kit manager can run the programme from day one.

How Does Colour Stay Locked Across a Cycle?

By never re-opening it. The colour is approved once, on every substrate, and the approval is held as physical coupons. The reorder is measured against those coupons rather than against a memory, a photograph or an ageing bag — all three of which drift.

The dye lot is the second half of the lock. Within a lot the colour is consistent; between lots there will be a difference. A reorder that quotes the previous lot number gives the dye house something to aim at. A reorder that does not is a fresh match, and a fresh match is a fresh opportunity to drift. The method is set out in Reorder colour consistency.

Retained coupon card and dye-lot record sheet filed with a tech pack
Four artefacts carry a colour across a cycle: reference, coupons, lot record, shade band.

How Should a Programme Handle More Than One Sport?

Clubs that run several sports face a choice: one silhouette for everything, or a silhouette per sport. The right answer is usually in the middle — one shell silhouette in one colourway, with the sport-specific features carried as options: a bat sleeve here, a ball holder there, a wet pocket everywhere.

The reason is the minimum. MOQ 500 pcs applies per style and colourway, so four sport-specific silhouettes is four minimums. One silhouette with four option packs is one minimum plus a small amount of trim variation, and it keeps the whole club on one colour approval — which is the part that matters to everybody who sees the club together.

Silhouette count drives minimum exposure far more than colourway count does.
Programme shapeSilhouettesMinimum exposureColour exposure
One silhouette, one colourway1MOQ 500 pcsOne approval
One silhouette, option packs per sport1MOQ 500 pcs plus trimOne approval
One silhouette per sport3 to 4Three or four minimumsOne approval
One silhouette per sport and per age group6 to 12Six to twelve minimumsOne approval if the colourway is shared

What Records Should the Club Keep and Where?

Records fail by being kept in the wrong place. A coupon set in a drawer at the ground, a dye-lot number in an email and a tech pack on somebody's laptop is three artefacts in three places, and the club will find two of them when it needs all three. The rule is one folder, physical and digital, held by the club rather than by any supplier.

The folder holds seven items: the colour reference with its library, the substrate list, the signed coupon set, the upper and lower shade coupons, the dye-lot history, the tech pack with its revision number, and the reorder date. That is the whole programme on one sheet of paper, and it is what makes the third year as easy as the first.

What Does the Programme Cost Across a Full Cycle?

Five levers decide it: quantity, silhouette count, colourway count, personalisation count and timing. The first four are design decisions made at the start; the fifth is a planning decision that a club can still get right or wrong several months later.

Timing is the one worth emphasising, because it is free to get right. Booking a production slot in the spring costs the same as booking it in June and delivers reliably instead of expensively. A club that plans the calendar saves more than a club that negotiates the price. The reasoning is set out in Why 35 to 50 days.

What Should the Club Review at the End of Each Cycle?

Three things, and the review takes an hour. What failed and where — the failure list is the specification input for the next revision. How much of the float was used — that is the attrition rate and it sizes the next order. And whether the colour held — which is a comparison against the retained coupon, not against a memory.

The end-of-cycle review, in three questions

  • What failed, and which clause on the tech pack would have prevented it?
  • How much of the float was used, and what does that say about the next quantity?
  • Did the reorder land inside the shade band, and is the coupon set still intact?

How Is the Programme Inspected Each Year?

The same way every year, with the criteria written by the club and agreed before inspection. AQL 2.5 under ISO 2859-1 at General Inspection Level II, with the defect classification agreed in advance: what counts as critical, what counts as major and what counts as minor.

The club-specific checks — compartment dimensions, base board presence, stitch type, colour against the coupon set, personalisation position — belong in the major classification, because that is what makes them enforceable at the Ac/Re decision. The sampling arithmetic is set out in AQL 1.5 versus 2.5.

What Goes Into the Enquiry at the Start of a Cycle?

Six fields, and the cycle starts cleanly. The two that are most often missing are the reorder expectation and the fixture date, and they are the two that change how the whole programme is scheduled.

  1. Silhouette and compartment layout, with dimensions rather than descriptions.
  2. Colour references for every visible substrate, with the library stated.
  3. Quantity split by style, colourway and age group.
  4. Personalisation: method, position, size and the files.
  5. The reorder expectation for the season, so the first order can be sized to reach it.
  6. The date the kit has to be on the bus, working backwards from the first fixture.
Kit room shelf showing several seasons of club bags in one consistent colourway
A programme that holds four artefacts will run the same colour for years.

What Does a Programme Become in Year Three?

By year three the work is nearly all done. The silhouette is settled, the colour has a coupon set and a lot history, the inspection criteria are written, and the reorder is a single email against a revision number. The whole cycle from enquiry to delivery is shorter, because nothing has to be decided twice.

That is the actual product here. A sourcing and programme-management company is not selling a bag; it is selling the point at which the club stops making the same decisions every year. The bag is the same. The calendar is what changes.

How Does Freight Fit Into the Cycle?

Freight is the part of the calendar clubs plan least and feel most. A shipment quoted FOB Xiamen leaves the club holding the booking, the transit and the customs entry, and all three have their own lead times that sit on top of the production window rather than inside it.

The practical fix is to decide the Incoterm at enquiry rather than at shipment, and to add the transit time to the backwards calculation. A club that works out the fixture date, subtracts the production window and forgets the transit will still be short, just later than it expected. CIF and DDP are available where the club wants a delivered figure.

What Does the Cycle Do to Working Capital?

A programme changes the shape of the spend rather than the size of it. One order a year with a float is a single payment cycle on T/T 30/70; four small orders are four payment cycles, four approval rounds and four freight movements, and they cost more in total even where each one is smaller.

The float is the lever. Ordering the squad plus staff plus a float costs a little more once and removes the emergency order entirely — and the emergency order is the most expensive unit a club will ever buy, because it carries an expedite fee, an air-freight charge and a fresh colour risk all at the same time.

How Should a Club Start If It Has No Programme at All?

Start with the date, not the bag. Fix the fixture the kit has to be ready for, work backwards through the bulk window, the sampling window and the club's own approval time, and see what date that produces. Everything else — silhouette, colourway, quantity — can be decided inside the time that is actually available.

Clubs that start with the bag routinely discover in June that the date they needed was in March. Clubs that start with the date discover the same thing in March, when there is still time to do something about it. The difference between the two is not effort — it is which end of the calculation the club started from.

The second thing a club without a programme should do is write down what it already knows. Even a club with no records has an attrition rate, a fixture date and a colour it is trying to protect. Those three facts, written down, are the beginning of a cycle, and the cycle is what makes year two less expensive to run than year one.

Start with the date, not the bag

Tell us the date the kit has to be on the bus and what has to go in it, and we come back with a cycle you can run for years and a delivery date you can calculate.

Frequently Asked Questions

What is an annual kit cycle?

One design approved once, produced once or twice a year, and reordered against the same approval.

How far ahead should a club raise an enquiry?

Work backwards from the first fixture: bulk 35-50 days, sampling 6-10 working days, plus the club's own approval time and any published shutdowns.

What is the difference between a reorder and a new order?

A reorder is a comparison against retained artefacts; a new order is a development. They carry different colour risk and different quantity thresholds.

What quantity applies to a reorder?

300 pcs is open to discussion on a repeat, against the standard MOQ 500 pcs per style and colourway.

How is the colour held across a cycle?

By approving a coupon set once, recording the dye lot, holding an upper and a lower shade coupon, and measuring the reorder against them.

Why do shutdowns matter?

They fall inside the production window and are published in advance. Ignoring them turns 35-50 days into a materially longer figure.

Should a multi-sport club run one silhouette or several?

One shell silhouette with sport-specific option packs. Each silhouette carries its own minimum.

What happens when the committee changes?

The programme is lost unless it is recorded. A one-page record with the reference, the coupon set, the lot numbers and the reorder date survives a handover.

How is a programme inspected each year?

At AQL 2.5 under ISO 2859-1, General Inspection Level II, with club-specific checks written into the major defect classification.

How long does sampling take?

6-10 working days from a signed-off tech pack, extending to 12-15 working days for a complex build or a new club colour.

How long is bulk production?

35-50 days from written sample approval.

What should a club review at the end of a cycle?

What failed, how much of the float was used, and whether the reorder landed inside the shade band.

People Also Ask

What is an annual kit cycle?

One design approved once and reordered against the same approval, year after year.

How far ahead should a club order?

Backwards from the first fixture: bulk 35-50 days plus sampling 6-10 working days.

What is the difference between a reorder and a new order?

A reorder is a comparison against retained artefacts; a new order is a development.

Why do shutdowns matter to the date?

They fall inside the production window and are published in advance.

Should a multi-sport club run one silhouette?

Yes — one shell with sport-specific option packs keeps the club to one minimum.

Sources and further reading

Every figure on this page is either our own programme data or attributed below. Open the originals before you write them into a specification.