What Has to Be in Writing Before a Calendar Date Is Locked?

Six fields: the trigger, the window, the end point, the stage list, the exclusions and the change rule. With all six the date can be missed; with three it can only be explained. We do not promise the fastest 20 days. We promise a delivery date you can calculate.

Delivery clause on one page with six numbered fields, both signatures and a version number
One clause on one page. Six fields spread across four emails are four documents, not one.
Quick answer

A locked date is a date with six fields written around it: the trigger that starts the clock, the window in days, the end point as an Incoterms place, the stage list behind it, the exclusions named as dates, and a change rule with a consequence attached. A date with none of those is a target, and a target is not something that can be missed. The six fields are the whole difference between a promise and a hope.

Most delivery dates are agreed in a sentence and remembered in two different ways. The buyer hears an arrival; the production side meant a departure. The buyer hears a completion date; the production side meant the day the goods were packed. Both parties are truthful and both are describing a different measurement, which is why the argument happens six weeks later rather than at the point the date was set. This piece is the six fields that remove the ambiguity, and what to do with them when the date is missed.

What Does It Mean to Lock a Delivery Date?

It means both parties have agreed the same six things, in writing, and the date is the output of them. Locking is not a stronger promise; it is a more precise one. The strength comes from the fact that every element of the measurement has been named, so that when the goods are late there is no argument about what was meant, only about whether the dates were met.

The useful consequence is that a locked date can be missed in a way an unlocked one cannot. A target is always arguably met, because a target has no end point and no trigger to measure from. A locked date is either met or it is not, and that binary is what makes the consequence attached to it operable rather than theoretical.

Six fields. A date with all six can be missed; a date with two can only be explained.
FieldWhat it fixesWhat happens without it
Clock triggerThe event the window is counted fromTwo sides count from two different days
Window in daysThe length, as a rangeThe date is a hope with no arithmetic behind it
End pointThe place the promise reachesOne side means packing, the other the port
Stage listThe stages and their durationsThe date cannot be checked at all
ExclusionsNamed days at both endsEvery holiday becomes a dispute
Change ruleWhat a change does to the dateEvery change becomes an argument

The fourth row is the one that turns the others into something checkable. A trigger, a window and an end point will produce a date, and there is no way to test whether that date is possible without the stages. The stage list is what makes the other three fields honest, and it is the field most often left out because it is the one that takes an hour to produce.

What Has to Be True Before a Date Can Be Locked?

Four things, and each of them is a gate rather than a formality. The specification has to be frozen, because a date locked against a changing specification is locked against nothing. The material has to be identified, because the longest thread usually runs through it. The quantity has to be agreed, because it sets the sewing block. And the sample has to be approvable, because the clock starts on the approval.

The fourth gate is the one buyers most often want to skip, and it is the one that does the most damage when skipped. A date locked before the sample exists can be met only if the sampling window behaves, and the sampling window is a queue with other orders in it. Lock the date after the tech pack is signed off and before the sample is approved, and state which of the two the clock runs from.

Which Six Fields Make a Date Enforceable?

The six in the table, written as one clause rather than as six sentences scattered through an exchange. A clause is enforceable because it is one document; six sentences in four emails are six documents, and when there is a dispute the parties will each produce the two that favour them. Put the fields in one place and the document governs.

The clause should also carry the signature and the date of the agreement, and each edition should be numbered. A schedule that is revised without a version number produces two governing documents, and the argument about which one governs costs more than the clause itself. Numbering the editions is the least glamorous and most load-bearing thing in the file.

How Should the End Point Be Written?

As a place under the Incoterms rules, not as a country and not as a warehouse. Under FOB Xiamen the obligation ends at the ship rail, which is a precise and checkable moment; a promise to deliver to the buyer is a different obligation with a different set of legs in it, and it should be quoted under the term that describes it. The Incoterm decision tool tool walks the choice, and the answer changes the date as well as the price.

The reason the precision matters is that the end point decides who carries the transit. A promise that ends at the load port is one the production side can keep by meeting a cut-off; a promise that ends at a warehouse requires the production side to answer for a carrier, an entry and a receiving appointment, none of which it operates. Both are legitimate and they are not the same promise.

What Exclusions Belong in the Clause?

Public holidays, named as dates at both ends of the lane, and any other closure that is known in advance. The production-location arrangement is issued by the General Office of the State Council and it should be written in as the dates in that arrangement rather than as a reference to holidays in general. The destination end has its own calendar, and the receiving appointment is the leg that fails there.

Two further exclusions are worth naming because they are the ones argued about. The first is a buyer-side decision that is late: a dip that was not approved, a deposit that was not sent, an artwork that was not signed off. The second is a carrier event after the goods leave the production location, which belongs to the transit rather than to the window. Naming both keeps each side honest about what it can control.

How Does the Change Rule Work?

By restarting the clock rather than by arguing about the delay. Any change to the specification, the material or the quantity after approval issues a new date in writing, and the new date is the governing one. That single sentence removes the conversation about whether the change was material, which is a conversation with no commercial value and a great deal of heat in it.

It also needs a response window, or it will not work. A change note that asks for a revised date without saying by when is a request, and requests are answered in the order they are convenient. Two working days for a reissued schedule is short enough to be honoured and long enough to be realistic, and it should be in the clause rather than in the correspondence.

Four ways of writing the same promise, and four very different values.
How the date is usually writtenWhat it meansWhat it is worth
Goods will be ready in 35 daysNo trigger, no end point, no stagesNothing; it cannot be missed or met
35 days from approvalA trigger but no end pointHalf a clause; the arrival is still open
35-50 days from approval, on board at XiamenA trigger, a range and an end pointEnforceable, and not yet checkable
The six fields, in one clause, numberedEverything named and signedEnforceable and checkable

The third row is where most good clauses stop, and it is worth understanding what is still missing. A trigger, a range and an end point can be enforced, which is a great deal better than a hope, but they cannot be checked: there is no way to tell whether the range was possible. The stage list is the field that makes the clause checkable as well as enforceable.

Two versions of a delivery clause side by side, one with three fields and one with six
The third row is enforceable. The fourth is enforceable and checkable, and it costs one more hour.

What Consequence Should Be Attached to the Date?

One that operates on a milestone rather than on the final date. A consequence attached to the final date is invoked when the goods are already late, at which point it changes nothing and only allocates a loss. A consequence attached to a named milestone inside the run is invoked while there are still options, and it changes what happens next.

The form matters less than the timing, and the forms in use are ordinary: a retained payment, a freight contribution, or a rate adjustment on the units delivered late. What makes any of them work is that they are agreed before the run, written in the clause, and invoked on the milestone rather than at the end. A consequence nobody expects to be invoked is not a consequence.

What Happens When a Locked Date Is Missed?

Three things, in order, and all of them in writing. Establish which field was missed, because a missed ETD and a missed warehouse date are different failures with different owners. Establish the revised date with the cut-off that belongs to it. Then invoke the consequence on the milestone the clause names, on the day it was missed rather than when it becomes convenient.

The order matters because the parties will each be keen to argue their own field first. The stage list is what settles it: the miss is on a named row with a named date, and the row says who owns it. A clause with a stage list converts that argument into a reading of a document, which is the same service the six fields perform everywhere else in this cluster.

How Should a Locked Date Be Reissued?

With a version number, a date and the reason, and with the fields carried forward unchanged. A reissued date that also changes the trigger or the end point is not a reissue, it is a new agreement, and it should be treated as one and signed as one. Carrying the fields forward is what makes the comparison between the two editions meaningful.

The reissue should also record whether the consequence has been triggered, because that is what will be disputed later. One line — the milestone, the date it was due, the date it was met, and the consequence that follows — and the file answers the question before it is asked. The piece on Managing Bag Order Delays sets out the wider record, and this is the two lines of it that belong to the clause.

What Does a Locked Date Cost?

An hour of drafting and an agreement to answer a second question. That is the entire price of the difference between a delivery date that can be missed and one that can only be explained. On a 500-piece programme the clause is four paragraphs, and it is the only artefact in the file that operates on the day things go wrong.

There is a second return, which is that the discipline of writing it changes the number. A production side that has to name its stages before it quotes its date quotes a different date from one that does not, and the difference is usually at the honest end. Asking for the clause is a way of being quoted straight, in the same way asking for the schedule is.

Clock trigger
Written sample approval plus receipt of the deposit
Window
35-50 days, stated as a range, from the trigger
End point
On board at Xiamen under FOB terms
Stage list
The stages with their durations, and the critical thread named
Exclusions
Public holidays at both ends, named as dates
Change rule
Every change restarts the clock, reissued within two working days

Six fields, one page, and the delivery date stops being a sentence in an exchange. We do not promise the fastest 20 days. We promise a delivery date you can calculate. The clause is the calculation written down, and it is the only version of the date that survives a bad week.

What Does the Clause Say About Payment?

It ties the balance to the evidence rather than to the date, because a date can be met with the evidence still missing. A clause that makes the balance conditional on the inspection report and the booking note, delivered before the goods are loaded, protects the buyer on the one thing the date cannot reach: whether the lot was actually drawn and inspected at AQL 2.5 or merely finished.

That sentence is worth more than any consequence attached to a late date, because it operates on every order rather than on the one that went wrong. T/T 30/70 with the balance held against named documents is ordinary practice on a 500-piece programme, and it is the simplest way to put the quality calendar into the same clause as the delivery date, where the two belong together.

Locking a delivery date

  • A locked date is a date with six fields written around it, not a stronger promise.
  • The stage list is what makes a clause checkable as well as enforceable.
  • The end point is an Incoterms place, and it decides who carries the transit.
  • Attach the consequence to a milestone inside the run, not to the final date.
  • A reissue carries the fields forward unchanged and carries a version number.
Signed delivery clause with six fields, a version number and a milestone consequence attached
Six fields on one page, and a bad week becomes a matter of dates rather than of recollection.

Send us the date and we will write the clause with you

Send the tech pack, the quantity and the date you need the goods on board. You get the six fields with their days, the critical thread named and a clause signed before the run starts. Sampling 6-10 working days, bulk 35-50 days, AQL 2.5 under ISO 2859-1, FOB Xiamen.

Frequently Asked Questions

What does it mean to lock a delivery date?

Both parties agree the same six fields in writing: the trigger, the window, the end point, the stage list, the exclusions and the change rule.

What are the six fields of a delivery clause?

The clock trigger, the window in days, the end point as an Incoterms place, the stage list, the named exclusions and the change rule.

Why does a delivery date need a trigger?

Because without one the two sides count from different days. Ours is written sample approval plus receipt of the deposit.

How should the end point be written?

As a place under the Incoterms rules. Under FOB Xiamen the obligation ends at the ship rail.

What exclusions should be in the clause?

Public holidays at both ends of the lane, named as dates, plus any buyer-side decision that is late.

How does the change rule work?

Any change after approval restarts the clock, and the revised schedule is reissued in writing within two working days.

What consequence should be attached to the date?

One that operates on a milestone inside the run, because a consequence at the final date only allocates a loss.

What has to be true before a date can be locked?

The specification frozen, the material identified, the quantity agreed and the sample approvable.

What should happen when a locked date is missed?

Establish which field was missed, get the revised date with its cut-off, then invoke the consequence on the milestone the clause names.

How should a locked date be reissued?

With a version number, a date and the reason, and with the six fields carried forward unchanged.

Does locking a date make it more likely to be met?

Indirectly. The discipline of naming the stages before quoting the date changes the number that gets quoted.

What is the MOQ and does it belong in the clause?

500 pcs per style and colourway, with 300 open to discussion on a repeat. Quantity sets the sewing block and it should be named.

Is a consequence necessary on a first order?

It is the only thing that operates on the day the date is missed, and it costs one line in the clause.

Can the clause be used on a reorder?

Yes, and the window in it should be shorter, because the tooling thread and the validation are already on file.

People Also Ask

How do I lock a delivery date with a supplier?

Agree the six fields in one written clause: the trigger, the window, the end point, the stage list, the exclusions and the change rule.

What should a delivery clause contain?

A clock trigger, a window as a range, an end point as an Incoterms place, the stage list, named exclusions and a change rule.

What is the clock trigger for a bag order?

Written sample approval plus receipt of the deposit, whichever is later.

What happens if a locked delivery date is missed?

Establish which field was missed, get the revised date, and invoke the consequence on the milestone.

How do I make a delivery date enforceable?

Name the six fields in one clause, number each edition, and attach the consequence to a milestone.

Sources and further reading

Every figure on this page is either our own programme data or attributed below. Open the originals before you write them into a specification.