AQL 2.5 Sampling Table: Sample Sizes and Acceptance Numbers Explained

Two lookups build every AQL 2.5 plan. Lot size and inspection level return a code letter from the first table; the letter returns the sample size. Then the AQL 2.5 column returns an accept number and a reject number. Nothing is calculated and nothing is negotiated on the day.

Sampling table page showing code letters and sample sizes
Table 1 and Table 2-A read together: letters on the left, AQL columns across the top.
Quick answer

The table is a lookup, not a formula. Lot size plus inspection level gives a code letter. The code letter gives the sample size. AQL 2.5 gives accept and reject for that sample. If a number cannot be traced back through those three steps, it did not come from the standard.

The most common failure in an inspection brief is not a wrong number but a missing one. A buyer specifies AQL 2.5 and assumes that determines how much of the order gets opened. It does not. The sample size was fixed by two other decisions before the AQL was ever consulted, and those two decisions — the lot presented and the inspection level agreed — are the ones that decide how much evidence the verdict rests on.

What Are the Two Tables Behind Every AQL 2.5 Plan?

ISO 2859-1 publishes sample size code letters in one table and sampling plans in another. The first takes the lot size across the top and the inspection level down the side, and returns a letter between A and R. The second takes that letter in the left column and an AQL value across the top, and returns a sample size with an accept number above a reject number.

Reading them in the wrong order produces most of the confusion in the market. A buyer who starts at the AQL has already lost the decision that mattered. Start at the lot size, move to the letter, take the sample, and only then read the accept and reject pair. Everything downstream — how long the visit takes, how much the inspection costs, what the plan can detect — was decided by step two.

How Do You Find the Sample Size Code Letter?

Enter Table 1 with the size of the lot being presented and read across to the column for the agreed inspection level. A lot of 500 pieces under General Inspection Level II lands in the 281 to 500 band and returns H. The lot is what is offered at one time for one inspection, not the purchase order quantity: an order of 2,000 pieces shipped as four lots of 500 inspects four times at code letter H, which is a materially different outcome to inspecting once at code letter K.

This is why split shipments need to be addressed before they happen. Splitting a lot to stay under a convenient sample size band is a recognised way to weaken a plan without changing a word of the specification. The remedy is simple and belongs in the purchase order: lots are defined by the shipping schedule agreed at order placement, and re-splitting afterwards requires written approval.

What Sample Size Does Each Code Letter Carry?

The letters run from A to R, and for the sizes that matter to bag programmes the progression is not linear. It roughly doubles every two or three letters, which means the cost of inspection scales far more slowly than the size of the order. A 3,000-piece order is examined to the tune of 125 units; a 30,000-piece order draws 315. The plan buys information about the process, not coverage of the cartons.

Accept and reject at AQL 2.5 only. Single sampling, normal inspection, General Inspection Level II. Sample sizes above 500 units are rare on bag programmes and expensive to inspect.
Lot size (pcs)Code letter, Level IISample sizeAQL 2.5 AcAQL 2.5 Re
2 to 8A201
9 to 15B301
16 to 25C501
26 to 50D801
51 to 90E1301
91 to 150F2012
151 to 280G3223
281 to 500H5034
501 to 1,200J8056
1,201 to 3,200K12578
3,201 to 10,000L2001011
10,001 to 35,000M3151415
35,001 to 150,000N5002122

What Are the Accept and Reject Numbers at AQL 2.5?

The accept number, written Ac, is the largest number of defects the sample may hold and still pass. The reject number, Re, is the count at which the lot fails. The two always differ by one, and there is no band between them. At code letter H the pair is 3 and 4: three defects in fifty units releases the lot, and a fourth fails it. Both numbers count defects, not defective units — one unit carrying two listed faults contributes two.

That distinction decides real outcomes. A lot with two badly made units, each carrying two major faults, produces a count of four and fails even though only two units were touched. Buyers who prefer to count defective units rather than defects can ask for that convention, but it has to be stated before the visit, because it loosens the plan by roughly the number of faults a single unit typically carries.

Why Do the Smallest Code Letters Force a Change of Plan?

Below about 32 units the arithmetic stops working. There is no sensible way to express 2.5% of eight units, so the table cannot offer the plan being asked for and prints an arrow instead. The arrow points to the first plan that does exist, usually one with a different sample size or a different AQL column. Following the arrow is mandatory: a plan that ignores it is not a plan from the standard at all.

In practice this affects sample orders and top-up orders, where lots are small because the quantity is small rather than because anything has been split. A 40-piece replacement shipment draws code letter D and a sample of eight units, and at AQL 2.5 that plan accepts nothing and rejects at one. The practical response for very small lots is usually a full check or an agreed concession, not a battle over which arrow applies.

What Do the Arrows in the Table Mean?

There are two places arrows appear, and they point in different directions for different reasons. A down arrow beneath an AQL column means no plan exists at that combination of sample size and AQL: shift down the column until you meet a valid row, and use the accept and reject pair printed with it, adjusting the sample size to match. An up arrow appears where the plan would be uneconomically tight and points to a larger sample with a higher accept number.

Both changes should be recorded on the report. An inspection executed at a sample size that differs from the code letter is legitimate only if it followed an arrow, and if nobody wrote down which arrow, nobody can verify it. Reports that quote a sample size without showing its derivation are the single most common sign that the plan was improvised.

How Does the Table Change Under Tightened or Reduced Inspection?

The tables repeat for each switching state, and this is where the same AQL 2.5 label stops meaning the same thing. Under tightened inspection the sample size is unchanged but the accept and reject pair moves down by roughly one: a lot that passed comfortably last month now sits on the boundary. Under reduced inspection the sample falls to about 40% of normal, with its own accept and reject pair and its own rules for leaving the state.

For a buyer comparing quotations, this is the trap. Two vendors both writing AQL 2.5 may be running plans that differ by a full unit of tolerance and by 60% of the sample size, purely because their programmes sit in different states. Ask for the state, then compare. A programme that has never been tightened is either very good or rarely inspected.

ISO 2859-1 is a continuing-series scheme. A single lot verdict means less than the state the programme sits in.
StateWhen it appliesEffect on the sampleHow the state changes
NormalThe default at the start of a programme and after a return from either other stateSample size from the code letter; Ac / Re from the AQL columnTwo of five or fewer consecutive lots rejected moves the programme to tightened
TightenedAfter the trigger aboveSame sample size, a stricter accept and reject pairFive consecutive lots accepted returns the programme to normal
ReducedAfter a sustained clean run under normal with steady output and the responsible party agreeingRoughly 40% of the normal sample sizeOne rejected lot or irregular output returns the programme to normal
DiscontinuedWhen tightened inspection has run for a stated number of consecutive lots without acceptanceNo sampling; acceptance stopsRequires the defect cause to be found and corrected before inspection resumes

What Does Double Sampling Look Like on the Same Table?

Double sampling is the optional third table, and it exists to reduce the average number of units examined on good lots. A first sample is drawn and read against two thresholds: below the first, accept; above the second, reject; in between, draw a second sample and judge the combined result against cumulative numbers. Clean lots are cleared on the small first sample; only the borderline ones consume the extra work.

The attraction is cost, but the hidden cost is complexity. Two sets of accept and reject numbers, a decision rule between samples, and a second visit or a longer one when the first lands in the middle. Single sampling remains the right default for bag programmes precisely because every party can read the outcome without reference to a second decision. State single sampling unless the double plan has been agreed and priced.

Where Does the Inspection Level Change the Answer?

Comparison of sample sizes drawn under different inspection levels
The same 500-piece lot draws 13 units at S-4 and 80 at Level III.

The inspection level is chosen before the plan and it moves the sample harder than the AQL ever does. Taking the standard 500-piece order: Special Level S-4 draws 13 units, General Level I draws 20, Level II draws 50, and Level III draws 80. Each step changes both the cost of the visit and the ability of the plan to detect a poor lot, and none of them changes a single character in the AQL 2.5 description.

Same 500-piece lot, four levels. Only Level II should be assumed; every other level has to be named and priced.
Inspection levelCode letter for 281 to 500 pcsSample sizeWhen it is used
Special Level S-4E13Destructive or very costly tests where sample size must stay small
General Level IF20Where inspection cost dominates and the risk of passing a poor lot is accepted
General Level IIH50The working default for general merchandise, including bag programmes
General Level IIIJ80Where a defect carries a high downstream cost or a safety consequence

How Should the Sampling Table Be Reproduced in a Specification?

Do not reproduce it. Instead specify the standard by edition, the inspection level, single versus double sampling, the AQL by defect class, and the switching state at the start of the programme. Those five references reconstruct the plan exactly and leave no room for a homemade table drifting away from the original — which is what happens when somebody copies eight rows out of a spreadsheet three years ago and nobody re-checks it.

The five references that replace a copied table

  • The standard and its edition: ISO 2859-1, or ANSI/ASQ Z1.4 where the programme runs on the American reference.
  • The inspection level: General Inspection Level II unless another has been agreed and priced.
  • Single sampling, stated explicitly, so nobody reaches for the double sampling table by habit.
  • The AQL by class: zero for critical defects, 2.5 for major, 4.0 for minor.
  • The switching state at the start of the programme, who records it, and who decides when it moves.

Once those five lines are written the table becomes verifiable rather than believed. Any lot quantity can be run through the AQL sampling table and the resulting sample size checked against the report. The guard against the one-in-three risk described above — a lot re-split to change its code letter — is dealt with at quotation stage, alongside the numbers set out in why the bulk window is 35-50 days: inspection closes the window, it does not sit inside it.

Check a plan before it goes into a contract

Send the lot quantity and the shipping split. The sample size, accept and reject pair come back traced through the standard.

Specification page listing the five sampling references
Five lines replace a copied table: standard, level, plan type, class levels, starting state.

Frequently Asked Questions

What is the sample size for AQL 2.5 at General Inspection Level II?

It depends only on the lot size. 281 to 500 pieces gives code letter H and 50 units; 501 to 1,200 gives J and 80; 1,201 to 3,200 gives K and 125. The AQL selects accept and reject, never the sample size.

How do I work out the code letter for my order?

Take the size of the lot presented for a single inspection, find its band in Table 1 of ISO 2859-1, and read across to the column for the agreed inspection level. Level II is the default for general merchandise soft goods.

What is the difference between Ac and Re?

Ac is the accept number — the highest defect count in the sample that still passes the lot. Re is the reject number — the count at which it fails. The two always differ by one, with no intermediate band.

Does the table count defects or defective units?

By default, defects: one unit with two listed faults counts as two. A specification can ask for defective units to be counted instead, but that loosens the plan and has to be agreed in writing before the visit.

Why does my small sample plan not match the AQL I asked for?

Because below roughly 32 units no plan exists at that combination, so the table prints an arrow and you must follow it to the nearest valid row. Following the arrow can change both the sample size and the accept number.

What sample size applies to a 1,000-piece lot?

Eighty units. A lot of 501 to 1,200 pieces at General Inspection Level II is code letter J, which carries 80 units. At AQL 2.5 that plan accepts 5 defects and rejects at 6.

Is ANSI Z1.4 the same table as ISO 2859-1?

For the levels used on general merchandise, effectively yes: the American standard is maintained with substantially equivalent tables and gives the same code letters and the same accept and reject pairs. Name one edition to avoid an argument later.

What changes when the plan switches to tightened inspection?

The sample size stays the same and the accept and reject pair drops by about one. Two rejections among five or fewer consecutive lots triggers the switch, and five consecutive accepted lots returns the programme to normal.

Should I use double sampling for bags?

Rarely. Double sampling saves money on consistently clean lots but adds a second decision rule and often a second visit when the first lands between the thresholds. Single sampling is easier to read, easier to dispute and easier to write into a contract.

How does shipping in separate lots affect the plan?

Each presented lot is inspected separately. Four lots of 500 units inspect at code letter H four times; one lot of 2,000 inspects at code letter K once. The second arrangement is stricter, so the shipping split should be agreed when the order is placed.

Can I choose a smaller sample to save inspection cost?

You can specify General Inspection Level I, which draws roughly 40% of the Level II sample. What you save is one inspector-hour per visit; what you spend is the ability of the plan to detect anything below a very poor lot. It is rarely a good trade.

Do I need the whole table in my specification?

No, and copying rows into a document is worse than referring to the standard. Cite the edition, the inspection level, single or double sampling, the AQL by class and the starting switching state — those five references rebuild the plan exactly.

People Also Ask

How do you read an AQL sampling table?

Find the lot size band in the code letter table and read across to your inspection level to get a letter. Take that letter to the sampling plan table and read across to your AQL column for the sample size and the accept and reject pair.

What is a code letter in AQL sampling?

A letter between A and R that stands for a sample size. It is assigned from the lot size and the inspection level, and it is the only thing that determines how many units are examined under a given plan.

What does General Inspection Level II mean?

The middle of three general levels and the default for most consumer goods. It balances inspection cost against sensitivity, drawing 50 units from a 500-piece lot; Level I draws about 40% of that and Level III about 160%.

What is the AQL 2.5 accept number for 80 units?

Accept 5, reject 6 at code letter J under single sampling, normal inspection. The same 80 units are read again with zero acceptance for critical defects and accept 7, reject 8 for minor defects at AQL 4.0.

Is a bigger sample always better?

A bigger sample detects more, and costs more, and delays more. Above about 315 units the additional detection on soft goods is small relative to the visit cost, which is why Level III is reserved for products with a safety or high downstream consequence.

Sources and further reading

Every figure on this page is either our own programme data or attributed below. Open the originals before you write them into a specification.